Post-Construction Cleaning Checklist: Rough, Final and Touch-Up

Post-construction cleaning happens in three phases: a rough clean after the messiest trades finish, a final clean once work is done and before inspection or handover, and a touch-up right before move-in. Schedule each one around the punch list so dust from late work doesn't undo the final clean.

Newly finished commercial building

Construction leaves dust everywhere, including places you can’t see until the light hits them. Post-construction cleaning is planned in phases so the building is clean when it matters: the inspection, the owner walk and move-in.

Phase 1: Rough clean

When: after drywall, paint and the messiest trades, before finish flooring and fixtures are complete.

  • Remove debris, scraps and packaging
  • Sweep and vacuum all floors
  • Vacuum dust from window sills, ledges and boxes
  • Clear out the inside of cabinets before shelves and hardware go in
  • Remove stickers and tape where they’re already done with

Phase 2: Final clean

When: all trades are finished and the punch list is mostly closed.

Top to bottom, every room

  • Dust and wipe light fixtures, vents and diffusers
  • Wipe walls and remove marks, overspray and tape residue
  • Clean doors, frames and hardware
  • Wipe switch plates and outlet covers
  • Clean baseboards and trim

Windows and glass

  • Remove stickers, labels and paint or mud spatter
  • Clean glass inside, plus frames and tracks

Kitchens and restrooms

  • Clean inside and outside cabinets and drawers
  • Clean and polish fixtures, sinks, counters and mirrors
  • Wipe appliances inside and out, and remove protective film

Floors

  • Vacuum carpet, including edges
  • Clean hard floors and remove residue
  • Finish or seal floors where specified (see floor care)

Phase 3: Touch-up clean

When: right before the owner walk, inspection or move-in.

  • Dust surfaces again from late punch work
  • Spot-clean glass and fixtures
  • Vacuum and mop one last time
  • Empty trash and stock restrooms if the building is opening

Scheduling tips

  1. Book the walkthrough early, before the final clean, so the crew sees the scope.
  2. Coordinate with the punch list. Any sanding, painting or ceiling work after the final clean means another touch-up.
  3. Change HVAC filters after construction dust settles and before the final clean, or dust will keep blowing out.
  4. Leave room for the touch-up in the schedule. It’s the clean the owner sees.

Plan your phases with us

We walk the project with you, plan each phase around your schedule, and quote it in writing. Request post-construction cleaning or read about our post-construction cleaning service.

Questions

When should the final clean be scheduled?

After the last trade is out and the punch list is mostly closed, and before the owner walk, the occupancy inspection or move-in. Leave time for a touch-up afterward.

Do you clean new homes as well as commercial buildings?

Yes. The phases are the same for a new home, a tenant improvement or a new commercial building.

Do you haul off construction debris?

Bulk debris and dumpsters are usually the builder's. We remove the dust, residue, stickers and small debris left behind. Tell us at the walkthrough what you need.